
    {"id":7627,"date":"2025-07-17T14:26:00","date_gmt":"2025-07-17T14:26:00","guid":{"rendered":"https:\/\/old.lindstromgroup.com\/uk\/?p=7627"},"modified":"2025-08-26T09:33:52","modified_gmt":"2025-08-26T09:33:52","slug":"demolition-risk-assessment","status":"publish","type":"post","link":"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/","title":{"rendered":"Demolition Risk Assessment: Guide, Hazards and Example Template"},"content":{"rendered":"\n<p>Before any demolition work begins, it is essential to carry out a detailed <strong>demolition risk assessment<\/strong>. This step ensures the health and safety of everyone involved and helps identify potential hazards that could cause injury, property damage or delays.<\/p>\n\n\n\n<p>In this guide, we\u2019ll explain what a demolition risk assessment is, what should be included, and how to create your own assessment using a clear structure.&nbsp;<\/p>\n\n\n\n<p>You&#8217;ll also find a practical <strong>demolition risk assessment example<\/strong> and template outline to support planning and compliance.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"900\" height=\"419\" src=\"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2025\/07\/01-two-risk-assessment-officers-conducting-site-assessment.jpg\" alt=\"Construction workers in high-visibility gear with a quote about demolition risk assessment.\" class=\"wp-image-19584\" srcset=\"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2025\/07\/01-two-risk-assessment-officers-conducting-site-assessment.jpg 900w, https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2025\/07\/01-two-risk-assessment-officers-conducting-site-assessment-300x140.jpg 300w, https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2025\/07\/01-two-risk-assessment-officers-conducting-site-assessment-768x358.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">What Is a Demolition Risk Assessment?<\/h2>\n\n\n\n<p>A demolition risk assessment is a safety planning document that identifies potential hazards during demolition work and outlines the measures needed to control or eliminate them.&nbsp;<\/p>\n\n\n\n<p>It forms part of the legal duty to manage health and safety under the Construction (Design and Management) Regulations 2015 (CDM 2015).<\/p>\n\n\n\n<p>This assessment should be carried out before any dismantling or structural alteration work begins and should be reviewed regularly as the project progresses.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"900\" height=\"419\" src=\"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2025\/07\/02-principal-contractors-overseeing-safety-measures-on-site.jpg\" alt=\"Contractors in safety gear reviewing demolition site safety measures.\" class=\"wp-image-19585\" srcset=\"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2025\/07\/02-principal-contractors-overseeing-safety-measures-on-site.jpg 900w, https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2025\/07\/02-principal-contractors-overseeing-safety-measures-on-site-300x140.jpg 300w, https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2025\/07\/02-principal-contractors-overseeing-safety-measures-on-site-768x358.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Who Is Responsible for a Demolition Risk Assessment?<\/h2>\n\n\n\n<p>Several duty holders are involved in the planning and execution of safe demolition projects:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Clients<\/strong>: Must appoint qualified and experienced contractors and ensure relevant information is shared.<\/li>\n\n\n\n<li><strong>Principal Designers<\/strong>: Should manage and coordinate pre-construction health and safety planning.<\/li>\n\n\n\n<li><strong>Principal Contractors<\/strong>: Are responsible for managing on-site safety during demolition work.<\/li>\n\n\n\n<li><strong>Subcontractors<\/strong>: Must follow risk assessment controls and use appropriate personal protective equipment (PPE).<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">What Should Be Included in a Demolition Risk Assessment?<\/h2>\n\n\n\n<p>A demolition risk assessment should include all foreseeable hazards, and the actions required to mitigate them. Each hazard is assigned a risk level\u2014typically low, medium or high\u2014based on its likelihood and potential impact.<\/p>\n\n\n\n<p><strong>Key Hazards to Include:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Falls from height<\/strong>: Open floors, fragile surfaces and unguarded edges<\/li>\n\n\n\n<li><strong>Fire risks<\/strong>: Sparks or flames from cutting tools and combustible materials<\/li>\n\n\n\n<li><strong>Hazardous materials<\/strong>: Asbestos, dust, chemicals, flammable liquids<\/li>\n\n\n\n<li><strong>Structural collapse<\/strong>: Uncontrolled or premature collapse of the structure<\/li>\n\n\n\n<li><strong>Falling debris<\/strong>: Flying materials, tools or partially demolished sections<\/li>\n\n\n\n<li><strong>Noise and vibration<\/strong>: Prolonged exposure from tools or machinery<\/li>\n\n\n\n<li><strong>Connected services<\/strong>: Live electrical cables, gas lines and water systems<\/li>\n\n\n\n<li><strong>Worker involvement<\/strong>: Inadequate awareness or use of safety procedures<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Risk Ratings<\/h2>\n\n\n\n<p>Each risk should be assessed with a clear rating:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Low risk<\/strong>: Safe to continue with existing controls<\/li>\n\n\n\n<li><strong>Medium risk<\/strong>: Proceed with additional control measures in place<\/li>\n\n\n\n<li><strong>High risk<\/strong>: Do not proceed until the risk is fully mitigated<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">How to Control Risks in Demolition<\/h2>\n\n\n\n<p>Once hazards are identified, suitable control measures must be implemented. Examples include:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Hazard<\/strong><\/td><td><strong>Control Measures<\/strong><\/td><\/tr><tr><td><strong>Falls from height<\/strong><\/td><td>Use edge protection, safety harnesses and secured scaffolding<\/td><\/tr><tr><td><strong>Fire<\/strong><\/td><td>Update fire points regularly and maintain clear escape routes<\/td><\/tr><tr><td><strong>Hazardous materials<\/strong><\/td><td>Conduct asbestos surveys and follow COSHH regulations<\/td><\/tr><tr><td><strong>Collapse<\/strong><\/td><td>Plan structural sequence and use physical barriers or spotters<\/td><\/tr><tr><td><strong>Debris<\/strong><\/td><td>Establish exclusion zones and provide hard hats and reinforced equipment<\/td><\/tr><tr><td><strong>Vibration<\/strong><\/td><td>Limit exposure and rotate workers using vibrating tools<\/td><\/tr><tr><td><strong>Connected services<\/strong><\/td><td>Isolate utilities before work begins and clearly label residual lines<\/td><\/tr><tr><td><strong>Worker safety<\/strong><\/td><td>Provide PPE such as hard hats, goggles, gloves and flame-retardant clothing<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Demolition Risk Assessment Example<\/h2>\n\n\n\n<p>Here is a simplified demolition risk assessment example to help visualise how it can be structured:<\/p>\n\n\n\n<p><strong>Activity<\/strong>: Removal of roof structure<br><strong>Hazard<\/strong>: Fall from height<br><strong>Risk Level<\/strong>: High<br><strong>Control Measures<\/strong>: Scaffolding with edge protection, safety harnesses<br><strong>Responsible Person<\/strong>: Site supervisor<br><strong>Status<\/strong>: Controls in place<\/p>\n\n\n\n<p><strong>Activity<\/strong>: Dismantling of internal walls<br><strong>Hazard<\/strong>: Airborne dust and debris<br><strong>Risk Level<\/strong>: Medium<br><strong>Control Measures<\/strong>: Dust suppression equipment, PPE (dust masks and goggles)<br><strong>Responsible Person<\/strong>: Demolition contractor<br><strong>Status<\/strong>: In progress<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Demolition Risk Assessment Template<\/h2>\n\n\n\n<p>Although there is no single government-mandated format, your <strong>demolition risk assessment template<\/strong> should include the following sections:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Project details<\/strong> (site address, contractor, dates)<\/li>\n\n\n\n<li><strong>Activity descriptions<\/strong><\/li>\n\n\n\n<li><strong>Identified hazards<\/strong><\/li>\n\n\n\n<li><strong>Risk levels<\/strong><\/li>\n\n\n\n<li><strong>Control measures<\/strong><\/li>\n\n\n\n<li><strong>Assigned responsible persons<\/strong><\/li>\n\n\n\n<li><strong>Review dates and signatures<\/strong><\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">Example:<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Project Details<\/strong><\/td><td><\/td><\/tr><tr><td><strong>Site Address<\/strong><\/td><td>[Insert address]<\/td><\/tr><tr><td><strong>Contractor\/Company Name<\/strong><\/td><td>[Insert company name]<\/td><\/tr><tr><td><strong>Assessment Completed By<\/strong><\/td><td>[Name, Role]<\/td><\/tr><tr><td><strong>Assessment Date<\/strong><\/td><td>[DD\/MM\/YYYY]<\/td><\/tr><tr><td><strong>Review Date<\/strong><\/td><td>[DD\/MM\/YYYY]<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Risk Assessment Table<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Activity<\/strong><\/td><td><strong>Hazard<\/strong><\/td><td><strong>Risk Level<\/strong><\/td><td><strong>Control Measures<\/strong><\/td><td><strong>Responsible Person<\/strong><\/td><td><strong>Status<\/strong><\/td><\/tr><tr><td><strong>E.g. Roof dismantling<\/strong><\/td><td>Fall from height<\/td><td>High<\/td><td>Edge protection, safety harnesses, scaffolding<\/td><td>Site Supervisor<\/td><td>Ongoing<\/td><\/tr><tr><td><strong>E.g. Wall removal<\/strong><\/td><td>Structural collapse<\/td><td>Medium<\/td><td>Sequence planning, exclusion zone, supports<\/td><td>Project Engineer<\/td><td>Not Started<\/td><\/tr><tr><td><strong>E.g. Tool operation<\/strong><\/td><td>Noise &amp; vibration<\/td><td>Medium<\/td><td>PPE (ear defenders), work rotation<\/td><td>Site Manager<\/td><td>In Progress<\/td><\/tr><tr><td><strong>E.g. Site clearance<\/strong><\/td><td>Hazardous dust<\/td><td>Medium<\/td><td>Dust suppression, masks, goggles<\/td><td>Contractor<\/td><td>Complete<\/td><\/tr><tr><td><strong>E.g. Utility disconnection<\/strong><\/td><td>Live electrical lines<\/td><td>High<\/td><td>Isolate and label lines, use qualified electrician<\/td><td>Electrician<\/td><td>Complete<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p>To help with compliance, you can also refer to the <a href=\"https:\/\/www.hse.gov.uk\/construction\/safetytopics\/planning.htm\">Health and Safety Executive\u2019s Construction Phase Plan<\/a> as a useful guide. For more complex works, it can be adapted to include additional columns for risk scoring, residual risk, or inspection notes.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"900\" height=\"419\" src=\"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2025\/07\/03-worker-wearing-appropriate-safety-gear-to-protect-from-workplace-hazards.jpg\" alt=\"Worker in PPE highlighting common industrial hazards like fire, falls, and noise exposure.\" class=\"wp-image-19587\" srcset=\"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2025\/07\/03-worker-wearing-appropriate-safety-gear-to-protect-from-workplace-hazards.jpg 900w, https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2025\/07\/03-worker-wearing-appropriate-safety-gear-to-protect-from-workplace-hazards-300x140.jpg 300w, https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2025\/07\/03-worker-wearing-appropriate-safety-gear-to-protect-from-workplace-hazards-768x358.jpg 768w\" sizes=\"(max-width: 900px) 100vw, 900px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Frequently Asked Questions<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">What is a demolition risk assessment?<\/h3>\n\n\n\n<p>It is a safety planning document that identifies risks during demolition and outlines how to control them to protect workers and the public.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Who should carry out a demolition risk assessment?<\/h3>\n\n\n\n<p>Qualified professionals such as principal contractors or health and safety advisors are responsible, working under CDM 2015 regulations.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What hazards should be considered?<\/h3>\n\n\n\n<p>Common hazards include falls, fire, hazardous materials, structural collapse and noise or vibration exposure.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Is there a standard demolition risk assessment template?<\/h3>\n\n\n\n<p>No, but many use a checklist format that includes hazard identification, risk level, control measures and responsible persons.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Where can I find a demolition risk assessment example?<\/h3>\n\n\n\n<p>Sample templates can be found via HSE\u2019s Construction Phase Plan resources or adapted from industry best practices.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Final Thoughts<\/h2>\n\n\n\n<p>A well-prepared <strong>demolition risk assessment<\/strong> is essential for managing hazards, maintaining legal compliance and ensuring the safety of everyone on site. By identifying risks early and applying the correct controls, you can reduce the chance of accidents and keep your project running smoothly.<\/p>\n\n\n\n<p>For teams working in demolition, construction or industrial maintenance, Lindstr\u00f6m also offers workwear solutions designed for safety, including <a href=\"https:\/\/lindstromgroup.com\/uk\/services\/industrial-workwear\/hi-vis-workwear\/\">hi-vis workwear<\/a> and <a href=\"https:\/\/lindstromgroup.com\/uk\/services\/industrial-workwear\/flame-retardant-workwear\/\">flame-retardant garments<\/a>.<a href=\"https:\/\/lindstromgroup.com\/uk\/contact-us\/\">Contact us<\/a> to learn how our PPE and hygiene services can support your demolition project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Before any demolition work begins, it is essential to carry out a detailed demolition risk assessment. This step ensures the health and safety of everyone&#8230;<\/p>\n","protected":false},"author":14,"featured_media":19530,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"_eb_attr":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[1],"tags":[],"coauthors":[20],"class_list":["post-7627","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-article"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Demolition Risk Assessment | Guide, Hazards &amp; Template<\/title>\n<meta name=\"description\" content=\"Learn how to carry out a demolition risk assessment with our guide. Includes key hazards, control measures, responsibilities, FAQs and a template.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Demolition Risk Assessment | Guide, Hazards &amp; Template\" \/>\n<meta property=\"og:description\" content=\"Learn how to carry out a demolition risk assessment with our guide. Includes key hazards, control measures, responsibilities, FAQs and a template.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/\" \/>\n<meta property=\"og:site_name\" content=\"Lindstr\u00f6m UK\" \/>\n<meta property=\"article:published_time\" content=\"2025-07-17T14:26:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-26T09:33:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2020\/10\/0-featured-banner-house-being-demolished-by-excavator.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Lindstr\u00f6m Group\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Lindstr\u00f6m Group\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/\"},\"author\":{\"name\":\"Lindstr\u00f6m Group\",\"@id\":\"https:\/\/lindstromgroup.com\/uk\/#\/schema\/person\/9111900e3f15be99cf4a104112bf0bc3\"},\"headline\":\"Demolition Risk Assessment: Guide, Hazards and Example Template\",\"datePublished\":\"2025-07-17T14:26:00+00:00\",\"dateModified\":\"2025-08-26T09:33:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/\"},\"wordCount\":1000,\"publisher\":{\"@id\":\"https:\/\/lindstromgroup.com\/uk\/#organization\"},\"image\":{\"@id\":\"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2020\/10\/0-featured-banner-house-being-demolished-by-excavator.jpg\",\"articleSection\":[\"Article\"],\"inLanguage\":\"en-GB\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/\",\"url\":\"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/\",\"name\":\"Demolition Risk Assessment | Guide, Hazards & Template\",\"isPartOf\":{\"@id\":\"https:\/\/lindstromgroup.com\/uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2020\/10\/0-featured-banner-house-being-demolished-by-excavator.jpg\",\"datePublished\":\"2025-07-17T14:26:00+00:00\",\"dateModified\":\"2025-08-26T09:33:52+00:00\",\"description\":\"Learn how to carry out a demolition risk assessment with our guide. Includes key hazards, control measures, responsibilities, FAQs and a template.\",\"breadcrumb\":{\"@id\":\"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#primaryimage\",\"url\":\"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2020\/10\/0-featured-banner-house-being-demolished-by-excavator.jpg\",\"contentUrl\":\"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2020\/10\/0-featured-banner-house-being-demolished-by-excavator.jpg\",\"width\":1920,\"height\":1080,\"caption\":\"A house being demolished by excavator\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/lindstromgroup.com\/uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Article\",\"item\":\"https:\/\/lindstromgroup.com\/uk\/category\/article\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Demolition Risk Assessment: Guide, Hazards and Example Template\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/lindstromgroup.com\/uk\/#website\",\"url\":\"https:\/\/lindstromgroup.com\/uk\/\",\"name\":\"Lindstr\u00f6m UK\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\/\/lindstromgroup.com\/uk\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/lindstromgroup.com\/uk\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/lindstromgroup.com\/uk\/#organization\",\"name\":\"Lindstr\u00f6m UK\",\"url\":\"https:\/\/lindstromgroup.com\/uk\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/lindstromgroup.com\/uk\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2023\/10\/Logo512.png\",\"contentUrl\":\"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2023\/10\/Logo512.png\",\"width\":512,\"height\":109,\"caption\":\"Lindstr\u00f6m UK\"},\"image\":{\"@id\":\"https:\/\/lindstromgroup.com\/uk\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/lindstromgroup.com\/uk\/#\/schema\/person\/9111900e3f15be99cf4a104112bf0bc3\",\"name\":\"Lindstr\u00f6m Group\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/db72e9a46e0f7c5c437401114209c070c0ed0871f3f73ed82792b5cf14c95b5c?s=96&d=mm&r=g93dbf206f3a4403aba72a0da0a795367\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/db72e9a46e0f7c5c437401114209c070c0ed0871f3f73ed82792b5cf14c95b5c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/db72e9a46e0f7c5c437401114209c070c0ed0871f3f73ed82792b5cf14c95b5c?s=96&d=mm&r=g\",\"caption\":\"Lindstr\u00f6m Group\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Demolition Risk Assessment | Guide, Hazards & Template","description":"Learn how to carry out a demolition risk assessment with our guide. Includes key hazards, control measures, responsibilities, FAQs and a template.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_GB","og_type":"article","og_title":"Demolition Risk Assessment | Guide, Hazards & Template","og_description":"Learn how to carry out a demolition risk assessment with our guide. Includes key hazards, control measures, responsibilities, FAQs and a template.","og_url":"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/","og_site_name":"Lindstr\u00f6m UK","article_published_time":"2025-07-17T14:26:00+00:00","article_modified_time":"2025-08-26T09:33:52+00:00","og_image":[{"width":1920,"height":1080,"url":"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2020\/10\/0-featured-banner-house-being-demolished-by-excavator.jpg","type":"image\/jpeg"}],"author":"Lindstr\u00f6m Group","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Lindstr\u00f6m Group","Estimated reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#article","isPartOf":{"@id":"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/"},"author":{"name":"Lindstr\u00f6m Group","@id":"https:\/\/lindstromgroup.com\/uk\/#\/schema\/person\/9111900e3f15be99cf4a104112bf0bc3"},"headline":"Demolition Risk Assessment: Guide, Hazards and Example Template","datePublished":"2025-07-17T14:26:00+00:00","dateModified":"2025-08-26T09:33:52+00:00","mainEntityOfPage":{"@id":"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/"},"wordCount":1000,"publisher":{"@id":"https:\/\/lindstromgroup.com\/uk\/#organization"},"image":{"@id":"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#primaryimage"},"thumbnailUrl":"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2020\/10\/0-featured-banner-house-being-demolished-by-excavator.jpg","articleSection":["Article"],"inLanguage":"en-GB"},{"@type":"WebPage","@id":"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/","url":"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/","name":"Demolition Risk Assessment | Guide, Hazards & Template","isPartOf":{"@id":"https:\/\/lindstromgroup.com\/uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#primaryimage"},"image":{"@id":"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#primaryimage"},"thumbnailUrl":"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2020\/10\/0-featured-banner-house-being-demolished-by-excavator.jpg","datePublished":"2025-07-17T14:26:00+00:00","dateModified":"2025-08-26T09:33:52+00:00","description":"Learn how to carry out a demolition risk assessment with our guide. Includes key hazards, control measures, responsibilities, FAQs and a template.","breadcrumb":{"@id":"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#primaryimage","url":"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2020\/10\/0-featured-banner-house-being-demolished-by-excavator.jpg","contentUrl":"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2020\/10\/0-featured-banner-house-being-demolished-by-excavator.jpg","width":1920,"height":1080,"caption":"A house being demolished by excavator"},{"@type":"BreadcrumbList","@id":"https:\/\/lindstromgroup.com\/uk\/article\/demolition-risk-assessment\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/lindstromgroup.com\/uk\/"},{"@type":"ListItem","position":2,"name":"Article","item":"https:\/\/lindstromgroup.com\/uk\/category\/article\/"},{"@type":"ListItem","position":3,"name":"Demolition Risk Assessment: Guide, Hazards and Example Template"}]},{"@type":"WebSite","@id":"https:\/\/lindstromgroup.com\/uk\/#website","url":"https:\/\/lindstromgroup.com\/uk\/","name":"Lindstr\u00f6m UK","description":"","publisher":{"@id":"https:\/\/lindstromgroup.com\/uk\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/lindstromgroup.com\/uk\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Organization","@id":"https:\/\/lindstromgroup.com\/uk\/#organization","name":"Lindstr\u00f6m UK","url":"https:\/\/lindstromgroup.com\/uk\/","logo":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/lindstromgroup.com\/uk\/#\/schema\/logo\/image\/","url":"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2023\/10\/Logo512.png","contentUrl":"https:\/\/d2ris6qfzcz0wn.cloudfront.net\/wp-content\/uploads\/sites\/10\/2023\/10\/Logo512.png","width":512,"height":109,"caption":"Lindstr\u00f6m UK"},"image":{"@id":"https:\/\/lindstromgroup.com\/uk\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/lindstromgroup.com\/uk\/#\/schema\/person\/9111900e3f15be99cf4a104112bf0bc3","name":"Lindstr\u00f6m Group","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/secure.gravatar.com\/avatar\/db72e9a46e0f7c5c437401114209c070c0ed0871f3f73ed82792b5cf14c95b5c?s=96&d=mm&r=g93dbf206f3a4403aba72a0da0a795367","url":"https:\/\/secure.gravatar.com\/avatar\/db72e9a46e0f7c5c437401114209c070c0ed0871f3f73ed82792b5cf14c95b5c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/db72e9a46e0f7c5c437401114209c070c0ed0871f3f73ed82792b5cf14c95b5c?s=96&d=mm&r=g","caption":"Lindstr\u00f6m Group"}}]}},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"distributor_meta":false,"distributor_terms":false,"distributor_media":false,"distributor_original_site_name":"Lindstr\u00f6m UK","distributor_original_site_url":"https:\/\/lindstromgroup.com\/uk","push-errors":false,"_links":{"self":[{"href":"https:\/\/lindstromgroup.com\/uk\/wp-json\/wp\/v2\/posts\/7627","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lindstromgroup.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lindstromgroup.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lindstromgroup.com\/uk\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/lindstromgroup.com\/uk\/wp-json\/wp\/v2\/comments?post=7627"}],"version-history":[{"count":0,"href":"https:\/\/lindstromgroup.com\/uk\/wp-json\/wp\/v2\/posts\/7627\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lindstromgroup.com\/uk\/wp-json\/wp\/v2\/media\/19530"}],"wp:attachment":[{"href":"https:\/\/lindstromgroup.com\/uk\/wp-json\/wp\/v2\/media?parent=7627"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lindstromgroup.com\/uk\/wp-json\/wp\/v2\/categories?post=7627"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lindstromgroup.com\/uk\/wp-json\/wp\/v2\/tags?post=7627"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/lindstromgroup.com\/uk\/wp-json\/wp\/v2\/coauthors?post=7627"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}